Metro Station Elevated Corridor & Concourse Site A
High-density urban elevated transit project including 1.8 km of elevated double-line viaduct, 14 heavy pier caps, and full station concourse civil framework.
Critical Constraints & Site Obstacles
Executing heavy RCC casting in the middle of active 6-lane city traffic with overhead high-tension lines and tight 8-hour nighttime window constraints.
Technical Execution & Equipment Deployment
Engineered custom modular steel shuttering with hydraulic self-jacking platforms. Deployed 75-ton telescopic cranes with automated outrigger monitoring and high-early-strength M50 grade concrete mix achieving 70% design strength within 72 hours.
Contractual Scope of Work & Milestones
Verified Project Metrics
Planning a Similar Civil Project?
Submit your structural drawings and site requirements for an item-wise rate estimate.
Request Project EstimateHave an Upcoming Infrastructure
or Commercial Project?
Partner with UV InfraBuild for robust RCC engineering, timely turnkey execution, and zero-compromise safety standards.

Plans into